Degreasing, stripping, deoxidation and oiling of dam chains


DEPLOYMENT
The initial deployment of the chains makes it possible to identify any blocked links before carrying out the pickling / passivation treatment.
DEGREASING
Degreasing is carried out by immersion in a bath of VPK (alkaline solution) at 40°C. The duration is to be adjusted according to the state of clogging of the chains.
RINSING
With water using a high pressure cleaner at 180 bars.
PICKLING-DEOXIDATION
By immersion in a bath of HYDRODECAP-ACIER (phosphoric acid solution) at room temperature. The duration is to be adjusted according to the oxidation state of the chains.
RINSING
With water using a high pressure cleaner at 180 bars.
PASSIVATION
By immersion in a bath of HYDROPASS-ACIER (alkaline solution) at room temperature, for a minimum of 2 hours.
DRYING
Draining and drying by natural evaporation.
CHECKS AFTER CLEANING (1/2)
Appearance examination: absence of oxidation,
Possible checks (dimensional, wear, etc.): these checks will be carried out by the customer; HYDROCHEM will make the chains available after the pickling / passivation treatment has been completed.
Mechanical examination: mobility control of each link
The mobility test of the links will be carried out after pickling / passivation and before oiling,
CHECKS AFTER CLEANING (2/2)
Control under illumination of surfaces.
OILING
To be carried out immediately after drying to avoid re-oxidation of the chains.
Lubrication by immersion in an oil bath at a temperature ≥ 40°C,
Duration: 2 soaks of 12 hours and 4 hours with intermediate draining of 3 hours.
CHECKS AFTER OILING
Uniform oiling.
FINAL PACKAGING
Once the oiling is finalized, the elements are packaged for return on site or in workshops.